The M1 Pacific Motorway, also known by the former names F3 Freeway, Sydney-Newcastle Freeway, and Sydney-Newcastle Expressway; is a 127 km (79 mi) stretch of freeway linking Sydney to the Central Coast, Newcastle and Hunter regions of New South Wales. It is part of the AusLink road corridor between Sydney and Brisbane. The name "F3 Freeway", reflects its former route allocation, but is commonly used by both the public and the government to refer to the roadway long after the route allocation itself was no longer in use.
Video Pacific Motorway (Sydney-Newcastle)
Route
At its southern end, the freeway starts at Pennant Hills Road, Wahroonga, near its junction with the Pacific Highway (Pearces Corner) in Sydney's north. It heads north, skirting the western edge of the Ku-ring-gai Chase National Park, running parallel with the railway line until it descends to the Hawkesbury River, crossing at Kangaroo Point in Brooklyn. Immediately north of the river, the Hawkesbury River interchange provides access to Brooklyn and Mooney Mooney before the road climbs. At Mount White there are major heavy vehicle checking stations on both northbound and southbound carriageways, to assess compliance and roadworthiness of trucks.
The freeway passes through the Brisbane Water National Park, and the Calga interchange gives access to Peats Ridge.The freeway then turns east to cross Mooney Mooney Creek by way of the 480 m (1,575 ft) long, 75 m (246 ft) high Mooney Mooney Bridge before it reaches the first major interchange on the Central Coast at Kariong.
After Kariong, the freeway continues through rural and semi-rural areas of the Central Coast with interchanges at Ourimbah, Tuggerah, Warnervale and Kiar, near Doyalson. From the Doyalson interchange the freeway continues to the west of Lake Macquarie with interchanges near Morisset, Cessnock, Toronto and West Wallsend.
At the West Wallsend interchange the Newcastle Link Road (A15) takes traffic into Newcastle via Wallsend and also connects with the M15 Hunter Expressway towards Kurri Kurri and Singleton, while the freeway continues north to end at the roundabout at the junction of Weakleys Drive and John Renshaw Drive, Beresfield. From here traffic bound for Highway 1 takes John Renshaw Drive and the New England Highway eastwards to meet the Pacific Highway at Hexham, and Weakleys Drive connects with the New England Highway towards Maitland.
Between Wahroonga and Ourimbah the freeway passes through rugged sandstone country, particularly as it descends to and ascends from the Hawkesbury River. This section of the freeway is characterised by deep cuttings and extensive embankments.
Maps Pacific Motorway (Sydney-Newcastle)
History
Planning for the freeway began in 1952, with the aim of providing a high-speed replacement for a section of the Pacific Highway that had been built in 1925-30 which was struggling to cope with the increased traffic. It was planned that the freeway would connect to the freeway systems being proposed for both Sydney and Newcastle, providing a city-to-city freeway link.
The route between Mount White and Kariong was originally planned to be further south than the route as built, with an easier crossing of Mooney Mooney Creek. By the time that construction on this section was to begin, resistance from the National Parks & Wildlife Service to the proposed route forced the Department of Main Roads to take a route through Calga, using part of the first stage of a proposed freeway route to Singleton which had been built the 1960s. That scheme has never been further developed.
The route through Wyong Shire also changed; instead of passing east of Wyong along the western edge of the Tuggerah Lakes, development in that area forced the freeway to be moved to the west of Wyong, with a link road being constructed to meet the Pacific Highway near Doyalson.
In addition, the freeway was revised to go to the west of Lake Macquarie rather than the east, and thereby bypass Newcastle. One of the reasons for this change of location was the issue of connectivity to the Pacific Highway north of Newcastle, as the route of the Newcastle Inner City Bypass, which would have provided a northern extension of the freeway, is problematic in terms of its northern terminus point at Sandgate not easily allowing for a northward freeway-standard route to join to the Pacific Highway.
The sections of the Newcastle Inner City Bypass from the Pacific Highway at Bennetts Green to Kotara and from Jesmond to Sandgate have since been constructed, while the original freeway route between Belmont and Bennetts Green and then northward to the Pacific Highway at Merewether Heights is still reserved from development, with the possibility that it could be constructed in the future.
The major stages in the construction of the freeway were:
- April 1963 - Construction began on the 7 km (4 mi) section from the Hawkesbury River to Mount White. This was opened as a toll road in December 1965.
- October 1966 - Opening of the Mount White-Calga section (including first section of proposed freeway to link to the New England Highway at Singleton).
- December 1968 - Opening of Berowra to Hawkesbury River section as a toll road.
- October 1973 - Completion of the Brooklyn Bridge, thereby connecting the Berowra-Hawkesbury River and Hawkesbury River-Calga sections. At this time the separate tolls for the sections north and south of the Hawkesbury (20 cents for each section) were abolished and a single toll of 50 cents was introduced. This was collected at the Berowra toll booths, and the Mooney Mooney toll booths were removed. The toll was removed in 1990 when the Federal Government adopted a policy that a condition of its direct funding of the national highways was that they were to be toll free.
- December 1983 - Concurrent opening of the Somersby to Ourimbah and Kangy Angy to Wallarah Creek sections, including the single carriageway motorway link from Wallarah Creek to the Pacific Highway at Doyalson.
- December 1986 - Opening of the 15 km (9 mi) section between Calga and Somersby including the Mooney Mooney Bridge.
- September 1987 - Freeway completed from Wallarah Creek interchange to Mandalong Road interchange.
- March 1988 - Freeway completed from Mandalong Road interchange to Freemans Waterhole interchange.
- March 1989 - Wahroonga to Berowra section opened As part of this work a new south bound truck weighing station was built on the existing alignment at Mount White, with a new southbound carriage built for car traffic to replace the facility at Berowra.
- December 1990 - Section from Freemans Waterhole Interchange to Palmer's Road completed.
- December 1993 - Palmer's Road to Minmi section opened.
- December 1997 - "Missing link" between Ourimbah and Kangy Angy opened.
- November 1998 - Final stage of freeway opened between Minmi and John Renshaw Drive, Beresfield.
- December 2004 - Completion of widening to six lanes of the four-lane sections between the Hawkesbury River and Calga.
- November 2009 - Completion of widening to six lanes of the four-lane sections between Wahroonga and the Hawkesbury River, resulting in a continuous six lane width over the 43 km (27 mi) from Wahroonga to Kariong. This work was completed in three stages; stage 1 - Cowan to Berowra (3.4 km (2 mi)), completed September 2008, stage 2 - Berowra to Mount Kuring-Gai (4.9 km (3 mi)), completed September 2009) and stage 3 - Mount Kuring-Gai to Mount Colah (4.2 km (3 mi)), completed November 2009.
In August 2013, road signs were changed to show the new M1 marker and the new name "Pacific Motorway" as part of a new statewide alpha numeric route scheme.
Upgrades and proposed connections
Strong public resistance in the 1970s to freeways being constructed within cities and unfavourable outcomes of government inquiries resulted in several freeway proposals in Sydney being abandoned. This included the connecting the Lane Cove Valley and North Western Expressways, which means that the Pacific Highway (a six lane urban arterial) continues to be the connecting route between the freeway's southern terminus at Wahroonga and the city centre.
However plans are currently being developed for extensions at both ends of the M1:
- The Federal Government supports the concept of a Sydney Bypass proposal, being a motorway connecting the M1 Pacific Motorway at Wahroonga with the M7 and thus the Hume Highway, leading southwest from Sydney towards Canberra and Melbourne. It has funded studies to identify options for such a connection. It will be a pair of tunnels connecting the Motorway at Pearces Corner, Wahroonga to the M2 Motorway near the Pennant Hills Road interchange. Due to community concern, Mahla Pearlman carried out an independent review which was completed in August 2007. The review concluded that the proposed tunnels should proceed as proposed under Pennant Hills Road, but urged that planning for the longer term connection between the F3 and the M7 should also commence immediately. On 16 March 2014, the preferred contractor for construction of the NorthConnex link was announced.
- As part of the upgrade of the Pacific Highway between Hexham and the New South Wales/Queensland border, a freeway extension is proposed to be constructed between the F3 at Black Hill (close to its current northern terminus) and the Raymond Terrace bypass. This section is currently a major bottleneck during holiday and long weekend periods, with delays lasting hours not uncommon. The layout of the twin bridges across the Hunter River at Hexham was designed primarily for local traffic to and from Newcastle, rather than to connect the Pacific Highway north of Newcastle to the freeway. This freeway extension is not anticipated to be constructed until after 2026.
- During 2013, planning began for the widening to six lanes of the four-lane section between the Tuggerah and Doyalson interchanges.
- Planning for the widening to six lanes of the four-lane section between the Kariong and Somersby interchanges is scheduled to begin in mid 2014.
"F3" designation
In addition to the National Highway 1 designation, the freeway at one stage carried the Freeway Route 3 (F3) designation. This route numbering system, introduced in 1971, was to provide distinctive route numbering and signage for freeways in Sydney and the surrounding areas. Although the route was never signed with the F3 route marker (the numbering system was removed in the late 1980s), the route is still often referred to as the F3 Freeway, with this title being used not only colloquially but on state and federal government documents and web sites and some road signs.
Traffic disruption
Other than the Pacific Highway, which the freeway has superseded, the freeway is the only direct route between Sydney and the Central Coast, and is the major road route for road transport from Sydney to the Hunter region, northern NSW and Queensland. The freeway thus carries a heavy mix of commuter traffic, road freight transport, and (periodically) holiday and recreational travellers. It often suffers from traffic disruptions, generally associated with traffic volume and congestion related to on-road breakdowns and vehicle accidents, or natural disasters (in particular, bushfire).
In addition traffic on the freeway is frequently affected by vehicle crashes, often involving trucks. These events have encouraged the NSW motoring organisation NRMA to call for more freight to be moved by rail to reduce the number of trucks using the freeway.
Bushfires have caused closure of the freeway and the nearby railway line and Pacific Highway between Sydney and the Hawkesbury River on a number of occasions. One such event of this type was recorded on 21 and 22 January 2007, when a fire broke out in the adjoining Kuring-gai Chase National Park. The fire forced the closure of the two roads and the railway line between Sydney and the Central Coast, resulting in extended disruption to traffic flow.
Because of the frequency of these disruptions to traffic flow, arguments for a second major freeway north from the Sydney metropolitan area continue to be pushed forward. However topography and resultant cost rules this out for practical purposes, other than indirect routes crossing the Hawkesbury in the vicinity of Wiseman's Ferry, some 30 km upstream of the current crossing.
Following criticism of significant delays due to accidents and blockages, the NSW Roads and Traffic Authority (RTA) is in the process of constructing a $28 million emergency plan for the freeway which involves development of a 40 km/h contraflow traffic scheme to allow vehicles to travel around an accident.
Traffic volume
The Annual average daily traffic (AADT) data from the Roads & Traffic Authority showed a decline in traffic volume on the freeway near its southern end at Wahroonga, from 78,600 in 2002 to about 76,600 in 2005 and then to 75,800 in 2006.
The 2004 AADT figures for other locations on the freeway include 73,400 at Mooney Mooney, just north of the Hawkesbury River bridge, 60,100 near Wyong, 38,500 near Wyee, 27,000 near Freemans Waterhole and 33,000 near its northern terminus at Beresfield.
Interchanges
See also
- The F3 Derby
- Freeways in Australia
- Freeways in New South Wales
References
External links
- Sydney-Newcastle Freeway at Ozroads Detailed site containing many existing and historical images.
- Live Traffic NSW F3 Traffic Cameras
- Pacific Motorway NSW Traffic Incident alerts & detailed traffic for the Sydney-Newcastle Pacific Motorway
Source of the article : Wikipedia